|
Table 21
|
|
•
|
Test group start time ( RJSTART );
|
|
•
|
Pause time between two test runs ( RJPAUSE );
|
|
•
|
AM (administration and maintenance) start authorization for the RTO of a unit (CC or LTG);
|
|
•
|
FA (fault analysis) start authorization for the RTO of a unit (CC or LTG);
|
|
Table 22
|