199
TSU - Test of Switching Unit
Restrictions
Functions of the AMO
Error Messages and Advisories
Interrelationships
Parameter Description
This AMO enables the operator to test the system units of the Switching Unit.
The AMO tests the peripherals (LTG, LTU, line modules, circuits, terminals, PNT, NT, PCM lines, SIU and CONF), the common control, the LTG switches and highways.
Warning
Running tests on the entire switch or shelf can take a long time.
${DocTitle}
, ID:
${DocID}
©
02/2025
Mitel Networks Corporation. - All rights reserved.
Mitel and the Mitel logo are trademarks of Mitel Networks Corporation. Unify and associated marks are trademarks of Unify Software and Solutions GmbH&Co. KG.
All other trademarks herein are the property of their respective owners.