If the connection between CCA/CCB and vNCUI is lost (i.e. between the host system and OpenScape 4000 SoftGate), the error message "LTUC OUT OF ATTENDANCE LIST" is generated and the OpenScape 4000 SoftGate is switched over ("SOFTGATE RECONFIGURATION START") (see AMO HISTA).
The successful switch over of the individual boards is confirmed with "BOARD RECONFIGURATION OK". The end of the complete switchover is acknowledged with "SOFTGATE RECONFIGURATION END".
A (5 minute) timer is started when the reconfiguration starts . This timer is stopped with the message "RECONFIGURATION END". If an END message has still not been received following expiry of the timer, the message "SOFTGATE RECONFIGURATION TIME" is issued (AMO HISTA). This can happen if several OpenScape 4000 SoftGates or a large number of subscribers have to be switched over and simply serves as additional notification that the move is still pending.
From the FA perspective, it cannot be established whether an error has occurred at the application or PC level (error or planned shutdown) or whether there is an IP network error (no connection to OpenScape 4000 SoftGate - CCA/CCB).
IMPORTANT:
The automatic switchover for failure cases e.g. cable disconnect/failure or OpenScape 4000 SoftGate outage is performed only once: from NORMAL to STBYRDY. Regardless of the state of the former NORMAL SoftGate there will be no further automatic switch back. In other words, the failure case happened and the automatic switchover was performed and the fault of the initial SoftGate has been repaired to STBYRDY, then a manual switchback needs to be executed to make the Automatic Switchover available again!